OUR BUSINESS

We hold hands with our global partners and head
towards the world through CDMO / R&D.

CDMO

Our plant in Vietnam is a factory dedicated to eye drops equipped with
global-level GMP facilities as well as a CDMO partner that provides
effective technology transfers, manufacturing/production of commercial
products, aseptic filling (completion), and analytic testing services.

Formulation

Preparation tanks with up to 2,000L of single
batch production capacity and aseptic
preparation facilities capable of carrying out
sterile filtration and micro grinding processes
are manufactured/installed in compliance with
ASME-BPE specifications.

Bottle Filling

Ensures high sterile stability of 6 logs in the
entire process of aseptic isolators, from
material injection to capping completion in
the high-speed charging line with a charging
speed of 250 per minute.

BFS Filling

Rotary-type BFS charger: 30000Amp per hour.
Rechargeable.
Better aseptic stability and higher productivity than shuttle-type.

CDMO

Our plant in Vietnam is a factory dedicated to eye drops equipped with global-level GMP facilities as well as a CDMO partner that provides effective technology transfers, manufacturing/production of commercial products, aseptic filling (completion), and analytic testing services.

Formulation

Preparation tanks with up to 2,000L of single batch production capacity and aseptic preparation facilities capable of carrying out

sterile filtration and micro grinding processes are manufactured/installed in compliance with ASME-BPE specifications

Bottle Filling

Ensures high sterile stability of 6 logs in the entire process of aseptic isolators,

from material injection to capping completion in the high-speed charging line with a charging speed of 250 per minute

BFS Filling

Rotary-type BFS charger: 30000Amp per hour.

Rechargeable
Better aseptic stability and higher productivity than shuttle-type